For a demonstration or a demo version please contact us at:

 

    admin@teromarine.no

 +47 55 94 24 60

 

Tero Marine AS

Kanalveien 105A
N-5068 Bergen
Norway

News in TM Master

 

TM Master Fleet Management Suite is continuously enhanced with new modules and functionality. Here you will find information about the latest features in TM Master and the modules that are coming soon.

 

Movable assets - coming soon

 

This module enables the ability to move both components and stock (stock locations) from any unit in the fleet to any other unit in the fleet.

The process includes the utilization of a pro forma invoice, creating a formal document and record of all movements together with details of the package sizes.

When transferring components from one unit to another, all important associated data (such as job history, connected spareparts etc.) is also transferred, but will also be available on the original unit (through the movable assets module). 

Movable components can be categorised so that replication data can be filtered for those units that are not required to receive information concerning specific types of movable components (e.g. A seismic vessel would not wish to receive information concerning ROV or Diving categorised components)

Moveable assets

 

Incidents - coming soon

 

An accident occurs. A near-accident occurs. Pollution is discovered.

Why did it happen? How often does it happen? What has to be done? Which consequences did it have? How to avoid it happening again?

Many questions, one solution - TM Incidents.

Tero Marine has developed a powerful tool in the TM Master Fleet Management Suite to handle the challenges connected to safety management. The module Incidents is the first part of the comprehensive HSEQA module in TM Master.

The incidents must be dealt with practically; registered, followed-up, analysed and reported. Initially, the on board personnel register the incident and the information is replicated to the office. Authorised personnel either on board or at the office set the required actions and approve the incident.

The on board personnel perform the required actions and close the incident by verification.

Incidents

The overview panes provide a cross-fleet overview of the incidents, how many there are and which status they have. You can also view the dates of registration for the incidents and the estimated time for completion presented in a timeline overview.

Through the use of TM Incidents and Failure reporting, you can create a broad awareness and consciousness about safety. This in turn will lower the incident repeat frequency and have a positive effect on the global safety level of your fleet of vessels.

 

Work permit - available now

 

A flexible work permit system assures that good safety practices and HSEQ standards are followed when carrying out maintenance routines. The system can be used both in conjunction with an existing paper system, and as a stand-alone electronic system. 

  • Attach work permits to jobs for HSEQ requirements
  • Define which crew types have the authority to approve each individual work permit
  • Applicants cannot approve their own work permit - there must always be two people involved for every work permit
  • Paper based and electronic work permit capability
  • Unlimited number of work permits connected to each job
  • Work permits saved with job history for possible later review

 

Hours of rest - available now

 

Monitor crew members’ minimum hours of rest, in accordance with international rules and regulations.

  • Graphical input of working hours
  • Trip by trip history of working hours

HOurs of rest

 

 

Consequence Analysis - available now

 

Consequence analysis provides an accurate and detailed overview of the different levels of consequence in connection with the potential loss of function of the equipment. The analysis gives the possibility to register consequence classification in compliance with future demands for classification of components.

  • Classify components according to the level of consequence to HSEQ, production and cost
  • Flexible risk value system allows prioritising of different categories
  • Risk value automatically calculated for each component
  • Jobs connected to a component with a sufficient risk value, generate a non.conformance when overdue